Worked example
Convert thickness into metres before multiplying length, width and thickness. A 5 m by 4 m slab at 10 cm thick requires 2 cubic metres before waste. A 10% allowance increases this to 2.2 cubic metres.
Assumptions and limitations
Confirm site dimensions, reinforcement, grade and supplier minimum orders with a qualified contractor.
Try your own values
Home · FREE TOOLConcrete Volume CalculatorEstimate rectangular slab concrete volume in cubic metres with waste allowance.